Frame Modification: Its starting to look like a chopper now.
| Frame
Cut: Cut
the backbone close to the seat mount. We are taking the stock "dip"
out of the backbone and replacing it with a clean straight tube. The upper tubes are then marked and cut. We leave a little extra tubing just before the curve. This will allow us to set the proper angle after the backbone length is finalized. | ||||
![]() | ||||
| Frame
Cut: After
the stock neck is disconnected, all the old stock tubing from the cast iron neck
is removed. This is were the new tubing will be installed/inserted. The remaining frame connection points are then cleaned and prepared for welding. | ||||
| Backbone
Fabrication: Based
on the computer drawing, the new backbone tube was cut for a total backbone length
of 27". The new 7 degree triple tree was assembled and attached to frame
neck and the fuel tank set on the backbone. The final backbone length was marked and cut Holes were drilled through the seat mount and the backbone for the spot welds to hold the inner tubing in place. | ||||
| Setting
the final Rake: The
new 10" over fork tubes are attached to the triple tree with the front wheel
installed. This is how the final rake will be determined. Before the final weld
is applied, the front tire will be deflated to simulate the weight of the engine
installed.
| ||||
| Down Tube Fabrication: With the front forks attached, the down tube length and angles can now be finalized. Small inner tubing is also cut, the upper connection inner tubing will have a small bend. | ||||
| Frame Assembly/Alignment: The new downtubes and inners are installed. Small holes are drilled through the outside for spot welds to connect the inner tubing. The backbone alignment is set to the original position using a plum-bob. Spot and stitch welds are used to hold the alignment in place. | ||||
| Frame Assembly/Welding: With frame locked down and aligned, stitch and spot welds are added. During each weld, the plum-bob on the backbone is checked. After the backbone is located in, the plum-bob is moved to the neck and the more welds are applied. Additional checks are performed to insure the neck is true. After the frame is stitched welded together, the final plum-bob position is dead center. | ||||
| Completion of Frame Modification Phase: The frame modification phase is now completed. All the frame welds have been finalized. The end result is 4in stretch in the backbone, 7in in the downtubes and 40* degrees of rake at the neck. | ||||


























