Photo Gallery

Home
About JH Choppers
Shop Tour
Apparel
Parts: Touring Dash Covers
Parts: Softail Dash Covers
Parts: Springer Adapters
Parts: Multi Fit Covers
Parts: One Offs
Parts: OEM
Bike Projects
Photo Gallery
Links
Blog
Contact

Whats New

Ignition Switch Covers

Check out these Touring Ignition Switch Covers. Chrome and Raw Finishes available. Black Anodized comming soon

AMD World Championship of Custom Bike Building

We had the great pleasure of being a Judge at the World Championship of Custom Bike Building

Whats Hot

Springer Riser Adapters

Check out these Springer Riser Adapters for after market springers from Paughco, MidUSAm MidWest and DNA

New Riding Shirts
New Riding Shirt
Check out this kick ass riding shirt Now Available


Quick Links:

Road King Candy Paint
Titan Sidewinder Fix
Road King Lowering Kit

Other Links:

Ring Roller Project

facebook
facebook

ebay deals
ebay deals

 

 

Welcome to the JH Choppers 1997 FXSTC Chopper Project Page.

Time to bolt it all together!

Frame Setup: With the frame and swing arm painted, it is placed onto the lift to start the final assembly. This will go quickly now that all the parts and sub-assembles have been previously installed during the hot mock-up phase.
Frame Setup
       
Triple Tree and Fork Tubes: The frame is carefully tied to the lift table and the 7* rake triple tree is installed into the frame neck. The fork tube assembly is then slid up into the tree. Masking tape is placed on the tree to prevent scratching the new paint.
Triple Tree and Fork Tubes
       
Front Wheel: The front wheel is installed and is placed into into the bike vice on the lift table.
Front Wheel Installed
    
Swing Arm: The swing arm is now attached to the frame (don't forget the belt). A chrome splash guard is attached to the front of the swing arm.
Splash Guard
Swing Arm   
Engine and Transmission Install: The lift is dropped to floor. Masking tape and bubble wrap is place onto the frame where the engine and transmission might bump into. The engine is carefully placed into the frame followed by the transmission and transmission plate.
Transmission Install
Engine Install
   
Rear Wheel: The rear wheel and air ride suspension is installed and aligned to the transmission. The axle covers are placed over the end of the swing arm and the license plate is attached to the axle.
Rear Wheel
    
Primary Drive/Starter/Oil Pan: The clutch, compensation sprocket and drive is installed. The starter and oil pan are placed in and the oil lines are connected.
Primary Drive
Oil Lines
   
Handle Bars and Controls: The handle bars are attached to the tress. All the cabling was connected together from the hot mock up, this makes the assembly very fast. The front brake is attached to the wheel, clutch line is attached and throttle cables are connected.
Handle Bars
     
Sheet Metal: The front fender, rear fender and tank are attached to the bike. Man.... Its looking really nice. The cosmetic tank extension looks awesome.
Chopper Tank
Front Fender
Rear Fender
  
Wire Harness: With the rear fender attached, we can add the wire harness. The fuse panel is built into the fender, there is no room for any electronics on a chopper...
Battery Installed
Front Wire Harness
    
Seat: We attached the seat and take it off the lift. Roll it out of the shop, add about 1 gal of gas... Done... She fires right up !!! (simple...)
Completed Bike
Rear Fender
Completed Tank
Completed BikeCompleted Bike